![](https://www.railwayage.com/wp-content/uploads/2024/07/Lamberts_Edited_1000px-315x168.jpg)
BNSF Completes Sandpoint Jct. Connector (Updated)
Written by Bruce E. Kelly, Contributing Editor![image description](https://www.railwayage.com/wp-content/uploads/2023/08/BK4_8089-E8.jpg)
On Aug. 7, 2023, with both mains through Sandpoint now in service, a westbound intermodal train crosses Bridge 3.9B, which opened last November, while an eastbound manifest waits on recently-renovated Bridge 3.9A before crossing over to the other main and continuing toward Whitefish, Mont. All photos: Bruce E. Kelly